Shandong China Coal Mucking Machine Co., Ltd.

Shandong China Coal Mucking Machine Co., Ltd.

Position: Home » Industry Info » Talk About The Secondary Maintenance Of Tunnel Mucking Machine

Talk About The Secondary Maintenance Of Tunnel Mucking Machine

Secondary maintenance of the rock mucking loader (1 maintenance per season): The administrative captain of the district team is fully responsible for each quarter, the technician in charge of the electromechanical transportation department will follow the technical guidance, and the district team technician, the deputy captain of the equipment supervisor, and the bucket rock mucking loader on duty The driver and the electric fitter of the chartered unit jointly form a maintenance team for maintenance, and the time is not less than 6 hours.

The responsibilities of the secondary maintenance of the tunnel mucking machine are as follows:

Talk About The Secondary Maintenance Of Tunnel Mucking Machine

(1)Strictly implement the work content of the primary maintenance of the rock mucking loading machine;

(2)Deal with the faults that cannot be handled by the first level maintenance of the tunnel mucking machine, and the technicians shall formulate relevant safety technical measures and carry out targeted maintenance. Before operating the mucking machine, the mucking machine driver must check the various components and electrical parts of the mucking machine, and confirm that they are correct before sending the start signal to attract the attention of other personnel.

Talk About The Secondary Maintenance Of Tunnel Mucking Machine

skype sail Online Email:sales@chinacoalintl.com
menu
Home Products Top

+

+

Please leave a message


sales@chinacoalintl.com